Projects |
|
1.5 MWatt Wind Turbine Gearbox
Data Acquisition and Control for High Accelerated Life Test for a major manufacturer of wind turbine power generation equipment. This gear unit was specifically for a 1.5 Megawatt generator which .....
|
|
Design Test:DC Locomotive Traction Motor
This project challenge was Automation of seven Development Test Stands for the world's leading manufacturer of DC Locomotives.
The system conducted various validation and development tests suc.....
|
|
Life Test :AC Locomotive Traction Motor
This project challenge was Automation of two Traction Motor Life-Test Rooms for the world’s leading manufacturer of AC Locomotives. The AC measurements are acquired using a Voltech power analyzer......
|
|
Bld 50 Plenum
To measure the airflow of a blower, or create a curve for a restrictor plate a plenum chamber is the ideal solution. With the capability to measure a wide variety of pressures and temperatures as wel.....
|
|
Locomotive Fuel Pump Test
Locomotive fuel pumps have a limited life and may present warning signs before they begin to fail. This setup was created to cycle a pump until it’s mechanical life is exceeded and begin to show sign.....
|